Got the pan and body finally bolted together with all the weatherstripping and stuff. Very happy how it all lined up so far. The extra tubing to front fork aligns very well to the beam center and thanks to Tomi got good clamps for mating those together. All there is really before welding those and back tubes to pan is to fabricate some extra diagonals from the main beam to the tunnel. Should get that done this week.

Made some seat attachments by using regular furniture tubing and steel profiles. They feel very solid even without the front attachment points. Seat angle, position and maneuvering the shifter and pedals feel to be about there, hard to say when the car is not moving and your speed is 0kmh... There is an adjustment on the clips to raise the seat for 3cm but I think I will not be using it. Sitting pretty high as it is now. Lower than original seat height of course.





Plumbing

Some images below of the fuel piping. Since the NHRA rules don't allow the lines to run inside the car and rounting them under the pan would be unsafe I looked into getting them inside the tunnel. Just like the original line does. Getting 2x 1/2'' lines inside the tunnel ain't that easy. Wanted to make them replaceable so they're clamped with rubber clamps via maintenance holes at the top. Will plug the holes with plastic sewage plugs before carpetting. The fuel pipes are one piece, only 1 fitting on both is inside the tunnel at the front where it turns 90 deg and exits. Found some suitable AN bulkhead fittings. A real pain to tighten them and install but in theory they are replaceable as planned. At the back there was very little room between the tranny and cage but they should work after a few mock ups very well...